Frequent question: How do I change the revision number in Solidworks?

What is the revision number?

The revision number is the number of times the document has been saved. That means it should correspond to the Date Modified field in the file manager, sometimes called Date Last Saved.

How do you revise a drawing in Solidworks?

Adding a Revision to the Table

  1. Right-click in the revision table and select Revisions > Add Revision. A revision is added to the table with the current date. …
  2. Click to place one or more revision symbols on the drawing. To add a leader, place the symbol on a vertex, edge, or face.

What is the difference between version and revision?

A version is an iteration, something that is different than before. … A revision is a controlled version. Webster’s dictionary describes a “revision” as the act of revising, which is to make a new, amended, improved, or up-to-date version.

How do you number a revision?

A revision number always has an even number of period-separated decimal integers. By default revision 1.1 is the first revision of a file. Each successive revision is given a new number by increasing the rightmost number by one. The following figure displays a few revisions, with newer revisions to the right.

IMPORTANT:  How do I delete a sheet in Autocad?

How do I change the revision symbol in solidworks?

Do one of the following:

  1. In a drawing with a revision already in the table, click Revision Symbol (Annotation toolbar), or click Insert > Annotations > Revision Symbol.
  2. Right-click in the revision table of the desired revision row and select Revisions > Add Symbol.

How do I edit a revision table in Solidworks?

Click Revision Table (Table toolbar), or click Insert > Tables > Revision Table.

How do I link a revision table in Solidworks?

Click Tools > Options > Document Properties > Tables > Revision. Set the options and click OK. In drawings with multiple sheets, you can set options to activate a revision table on the first sheet only, link the tables on all sheets, or keep the tables independent of each other.

When should I change my revision number?

The Revision number is changed manually when the document itself undergoes a significant change. This is to ensure that anyone with a hard copy or local copy knows when they need to update their copy.

What is the difference between issue number and revision number?

Super Moderator. We do have an issue date, and then revision numbers. If a revision is huge, changes the process completely, or otherwise pretty much changes everything, we re-issue the document and go back to rev 0.

How do you label a document revision?

Simple file versioning:

  1. Include a version number at the end of the file name such as v1, v2, or v1. 2, etc. …
  2. Include information about the status of the file, such as “draft” or “final. …
  3. Include information about changes that were made, such as “original” or “cropped”.
IMPORTANT:  How do I replace a family in Revit?

How do you number different versions?

3 These numbers have names. The leftmost number (1) is called the major version. The middle number (2) is called the minor version. The rightmost number (3) is called the revision but it may also be referred to as a “point release” or “subminor version”.

What is a revision or engineering change to a drawing?

Engineering, Design and Drafting Store. As changes to a component or system are made, the drawings depicting the component or system must be redrafted, updated and reissued. When a drawing is first issued, it is called revision zero or dash (-), and the revision block is empty.

How do you manage document revisions?

Four principles of document revision management

  1. The document numbering system should be agreed at the start of the project. …
  2. The revision coding system should be agreed as part of the above numbering system. …
  3. The revision code must continue sequentially from the first issue of a document through its entire life.